Insights

Filter Insights

Industry Insight
Topcon improves accuracy on historic London building redevelopment

When embarking on a development project that will see the creation of more than 70 luxury apartments in London, the JRL Group turned to Topcon Positioning GB to provide a complete end-to-end workflow solution.

Case Study
Dodging rocks: a new coastal road in the Indian Ocean

Case Study
Building beautiful homes in a matter of weeks

Here’s a question: with our global population growing so rapidly, and with construction as one of the least automated industries, how do we make sure we can provide everyone with a roof over their heads in the future?

How it Works
Topcon Workplace | MAGNET Field

Learn more about MAGNET Field at topconpositioning.com/workplace

How it Works
Topcon Workplace | MAGNET Office

Learn more about MAGNET Office at topconpositioning.com/workplace

Case Study
Intel® Falcon™ 8+ Drone – Topcon Edition | NEC and...

Learn more about the Intel Falcon 8+ Topcon Edition at

Case Study
Sitelink3D - Kansas Paving Case-study

Learn more about Sitelink3D at topconpositioning.com/sitelink3d

Case Study
3D-MCMAX - Kansas Paving Case-Study

Learn more about 3D-MC MAX at topconpositioning.com/3dmcmax

Case Study
How to quickly check wind turbines for damage

For some time now, a wind of change has been blowing in the German state of Schleswig-Holstein. In 2014, the northernmost state of Germany was the country’s first ever to meet all of its power needs from renewable energy resources, according to Worldwatch Institute Europe.